Global Acres June 26, 2025 0 Comments

Dholera Smart City Airport Connectivity Update 2025: How Gujarat’s Global Gateway is Powering Real Estate Growth

Dholera Smart City Sir Gujrat airport

In 2025, the Dholera International Airport is redefining Gujarat’s investment landscape. Located just 20 km from Dholera Smart City, this greenfield mega airport is rapidly progressing, with Phase 1 over 35% complete and expected to be operational by mid-2026. The airport is seamlessly linked to the Ahmedabad-Dholera Expressway, Metro corridor, and Dedicated Freight Corridor, making it a game-changer for logistics, real estate, and foreign investments. NRIs, MNCs, and infrastructure funds are accelerating bookings in nearby zones. Backed by ₹2,500 Cr government investment and high-level approvals, Dholera Airport is positioning the region as India’s next global trade and aviation hub—making 2025 the perfect entry point for strategic investors.

Table of Contents

  1. What’s New: Dholera Airport 2025 Status & Location

  2. Infrastructure Boost: Road, Rail, and Metro Integration

  3. Economic Impact: Industrial Growth & Real Estate Boom

  4. Government Plans & Future Prospects

  5. Why Investors Are Targeting Dholera in 2025

  6.  Price Table: Land Rates Near Airport

  7.  Legal Checklist for Buyers

 FAQs on Dholera Smart City Airport Connectivity

What’s New in 2025: Dholera Airport Status & Location

Location: Navagam village, 20 km from Dholera SIR, 100 km from Ahmedabad
Type: Greenfield international airport (Jointly developed by AAI & Gujarat Govt)
Site Area: 1,500+ hectares

 Phase 1 Development:

  • 3,200-meter runway (suitable for large aircraft)
  • Cargo & passenger terminals
  • Capacity: 2.5 million passengers annually (expandable to 50 million)
  • Current Status: 35% completed (Q2 2025)
  • Target Launch: Mid-2026

“This airport will anchor Gujarat’s global trade push and spur Dholera’s rise as a logistics and MNC magnet.” – AAI Official, June 2025

Infrastructure Boost: Road, Metro, and Freight Integration

Dholera Airport is part of a multi-modal logistics network connecting air, road, rail, and sea routes.

 Key Connectivity Projects:

  • Ahmedabad-Dholera Expressway: Operational, 100 km stretch reduces travel to 60 mins
  • Metro Rail (Dholera–GIFT–Ahmedabad): DPR approved, pre-construction work started
  • Dedicated Freight Corridor (DFC): Links ports with Dholera’s industrial zones
  • 6-Lane Airport Access Highway: Direct link to ABCD Building, Activation Area

Economic Impact: Industries, Jobs & Property Boom

 Industrial Momentum:

  • Vedanta-Foxconn exploring chip manufacturing plant

  • Tata Power, Micron, and JSW Group active in green energy, electronics

  • Cold Chain Warehouses planned near airport zone

  • Commercial Plot Prices have appreciated 25–40% since 2023

“This is India’s Shenzhen moment. Dholera’s air-linked industrial economy will reshape Gujarat’s GDP.”
Dr. R. Patel, Urban Economist, IIT Gandhinagar

Government Support & 2025 Budget Boost

The Dholera International Airport is a strategic node under India’s $1 Trillion Infrastructure Vision. Backed by:

 Government Initiatives:

  • ₹2,500 Cr budget allocation (Union + State)

     

  • Airport to serve as customs-exempt cargo hub

     

  • Planned aerotropolis development: office, hotel, warehousing, aviation academy

     

  • Green features: Solar panels, zero-discharge waste systems

     

Why Smart Investors Are Targeting Dholera in 2025

Key Reasons:

✅ Airport completion boosts global connectivity
✅ Low-entry rates in high-growth zone
✅ Real estate still undervalued vs. GIFT City, Ahmedabad
✅ Rising NRI and FDI interest
✅ Industrial + residential plots with NA NOC  & legal clearances

Price Table: 2025 Land Rates Near Dholera Airport

Plot Type

Location

Price/sq. yd (2025)

Commercial Plot

TP2 & TP3, near ABCD Building

₹12,000 – ₹22,000

Industrial Plot

Near Logistic Hub, Zone 4

₹12,500 – ₹25,000

Logistics/Warehouse Plot

Expressway Intersections

₹14,500 – ₹19,500

 All above are NA NOC  title-clear properties.

Legal Checklist for Airport Zone Buyers

Before buying land near the airport, verify:

  •  NA Land Status (Non-Agricultural clearance)

  •  Zonal Clearance from DSIRDA

  •  Approved Layout & Title Deed

  •  Builder’s DICDL NOC

FAQs

Near Navagam village, ~20 km from Dholera Smart City & 100 km from Ahmedabad.

 Phase 1 is expected to be operational by mid-2026.

 It will boost demand and prices for commercial, residential, and industrial plots near Dholera.

A metro corridor is planned and has DPR approval as of 2025.

Yes, and NRIs are actively buying airport-adjacent plots due to high ROI and global connectivity.

Leave a Comment