Dholera Smart City Airport Connectivity Update 2025: How Gujarat’s Global Gateway is Powering Real Estate Growth

The Dholera Airport (DIA) is not just an infrastructure project — it is the epicenter of Gujarat’s Dholera Special Investment Region (DSIR) and a strategic pillar of India’s Smart City Mission. For investors, NRIs, and commercial property buyers, understanding DIA’s progress, connectivity, and investment prospects is essential to capitalize on Dholera’s unprecedented growth trajectory.
In this comprehensive 2025 guide, we provide authentic, data-backed insights that surpass generic portals — covering latest project status, connectivity, ROI potential, and expert investment strategies.
Location Advantage of Dholera Airport
Strategic Location for Industrial Growth
- Navagam Village, Dholera Taluka, Ahmedabad District.
- 80 km from Ahmedabad (via Dholera Expressway — operational by June 2025).
- Located within the Delhi-Mumbai Industrial Corridor (DMIC) influence zone.
- 1 km from DSIR boundary, making it the closest air cargo hub for Gujarat’s industrial exports.
Why DIA’s Location is a Game-Changer:
- DSIR is India’s largest Greenfield Smart City (920 sq km).
- Proximity to manufacturing hubs, logistic parks, and maritime ports (Bhavnagar, Pipavav).
- Planned dual runways (4000m & 2910m) designed for Airbus A380 & Boeing 777 aircraft.
- Reserved 1426 hectares of land exclusively for airport infrastructure.
Updated Construction Progress (2025 Status)
Milestone | Current Status (2025) |
Site Clearance (MoCA) | Approved |
Environmental Clearance (EIA) | Completed by AAI |
Defence NOC (MOD) | Granted |
Detailed Project Report (DPR) | Finalized Q2 2025 (Updated) |
Phase 1 Runway (3200m) | 70% completed as of April 2025 |
Perimeter Fencing & Security Infra | 85% Work Completed |
Project Cost (Phase 1) | Rs. 636 Cr (Runway & Infrastructure) |
Contractors | Varaha Infra Ltd., Yashnand Engineers |
Expected Operational Year (Phase 1) | December 2025 (Confirmed PIB Timeline) |
Correction Note: Previous sources stating 2028 as operational year are outdated. PIB & DIACL confirm Phase 1 operations by December 2025.

Pricing Insights & ROI Potential (2025 – 2030)
Current Plot Prices Near Dholera Airport (2025)
Location | Price Range (per sq. yard) |
Activation Zone (Industrial) | Rs. 4000 – Rs. 7,500 |
Residential Zones near Airport | Rs. 9,500 – Rs. 12,500 |
Airport Road (Commercial Plots) | Rs. 18,000 – Rs. 25,000 |
ROI Catalysts:
- Public-Private Partnership (PPP) ensures faster development with private investment infusion.
- Expected passenger traffic: 2 million annually (updated PIB figures) in Phase 1.
- Cargo handling capacity to support industrial exports & e-commerce logistics.
- Hotel chains & MICE tourism infrastructure (Convention Centres) planned adjacent to airport.
Expert ROI Forecast (2025-2030):
- Capital appreciation: 250% – 300% for commercial properties.
- Rental yields: 8% to 10% per annum post-operations.
- Warehouse & Logistics Leasing demand to see a 3X rise by 2027.
Developer & Project Details (NA NOC , Title Clear & Legal Information)
- Executing Authority: Dholera International Airport Company Limited (DIACL)
- Stakeholders: Govt. of Gujarat, Airports Authority of India (AAI), DMICDC
- Development Mode: PPP Model under Greenfield Airport Policy
- Land Area: 1426 hectares (acquired)
- SPV Formation: Rs. 100 Cr equity infusion by Govt. of Gujarat.
Key Legal Approvals (All Cleared):
Approval | Status |
Ministry of Defence (MOD) NOC | ✔️ Granted |
Ministry of Civil Aviation (MOCA) Site Clearance | ✔️ Approved |
Environmental Impact Assessment (EIA) | ✔️ Completed |
PIB (Public Investment Board) Approval | ✔️ Approved |
Connectivity & Infrastructure Developments
Air Connectivity
- Designed for Airbus A380, Boeing 777 & wide-bodied cargo aircrafts.
- Dedicated Domestic & International Passenger Terminals.
- Integrated Cargo Terminal with warehousing & cold chain storage.
Road & Expressway Connectivity
- Dholera Expressway (Ahmedabad-Dholera): 109 km, operational by June 2025.
- State Highways SH-6 & SH-10 interlinking Dholera with Bhavnagar & Ahmedabad.
- Perimeter & Approach Roads under rapid development.
Rail & Metro Infrastructure
- Ahmedabad-Dholera Metro Corridor under DMIC master plan (alignment finalized).
- Dedicated Freight Corridor (DFC) Spur for industrial cargo movement.
- Provisions for future high-speed rail integration (bullet train phase extension).

Amenities & Lifestyle Features Around Dholera Airport
- World-Class Passenger Terminal with smart security & passenger management.
- Dedicated Cargo Terminal with cold storage, warehousing, and logistic parks.
- High-Street Commercial Plazas near Airport Road.
- Hotels, Convention Centres, and Business Lounges within 5 km radius.
- Eco-Green Zones with sustainable landscaping & water conservation.
- Proposed Global Exhibition Centre to support MICE tourism.
Market Trends & Investment Prospects (2025–2030)
Dholera Airport’s Impact on Real Estate
- Surge in demand for commercial plots & logistic warehouses.
- NRI & Institutional Investors targeting land parcels for industrial leasing.
- Rapid appreciation in retail spaces near Expressway junctions.
- MNCs & Aviation-linked businesses scouting for office hubs near airport influence zones.
Comparison: Dholera vs Jewar vs Navi Mumbai
Parameter | Dholera Airport | Jewar Airport | Navi Mumbai Airport |
Operational Year (Phase 1) | Dec 2025 (Confirmed) | 2025 | 2025 |
Proximity to Smart City | 1 km (DSIR) | 15 km (Noida Extension) | 10 km (Navi Mumbai Sectors) |
Total Land Reserved | 1426 hectares | 5000 hectares | 1160 hectares |
Cargo & Industrial Connectivity | High (DSIR Export Hub, DFC Access) | Medium (Logistics Park Planned) | High (JNPT Port Integration) |
Expected ROI (2025-2030) | 250% – 300% | 150% – 200% | 150% – 180% |
Expert Tips for Investors
- Invest Early (Before Full DPR Execution) to maximize land appreciation.
- Focus on Airport Road Commercial Plots & Expressway Connectivity Zones.
- Warehouse & Industrial Leasing near cargo terminals will be high-demand assets.
- Monitor SPV & DMICDC updates for upcoming infrastructure phases.
Dholera Smart City Airport Connectivity Update 2025 FAQs
As of mid-2025, Phase 1 Runway is 70% completed, and terminal infrastructure is underway. The airport is on track for December 2025 operations.
Dholera International Airport is 80 km from Ahmedabad. The Dholera Expressway, opening in 2025, will reduce travel time to just 45 minutes.
Key contractors include Varaha Infra Ltd. and Yashnand Engineers for runway and terminal development. Project cost for Phase 1 is Rs. 636 Cr.
2 million passengers annually and a dedicated cargo terminal designed to handle industrial exports and logistics demand.
Yes, Dholera International Airport is a key infrastructure under the DMIC corridor, designed to support export-oriented manufacturing units.
Conclusion: Expert Opinion & Call-to-Action
The Dholera International Airport is not just a project — it’s the economic catalyst that will transform Dholera SIR into India’s most advanced Smart City and Global Trade Hub. With all clearances secured, robust infrastructure backing, and a confirmed December 2025 operational timeline, Dholera presents a golden opportunity for early investors.
For investors, waiting post-2025 will mean entering at a premium price point. The time to act is now.
👉 Connect with Our Expert Team for Site Visits, Latest Plots Availability, and Investment Advisory.