Dholera Water Treatment Plant (WTP): The Cornerstone of a Sustainable Smart City

In the heart of Gujarat’s flagship greenfield smart city—Dholera Special Investment Region (DSIR)—the Water Treatment Plant (WTP) stands as a beacon of sustainable infrastructure. Aimed at providing 100% potable, safe, and reliable water supply, this project embodies cutting-edge design, environmental foresight, and long-term adaptability. If you’re an NRI investor or homebuyer, understanding the WTP’s scope, technology, and policy framework is essential for appreciating Dholera’s investment potential.
Dholera’s WTP utilizes a hybrid of modern processes, ensuring exceptional water quality:
These technologies together yield water that surpasses BIS Drinking Water Standards (IS 10500) and WHO norms—critical for residential and industrial needs.
Short-Term (0–3 years):
Medium-Term (3–7 years):
Long-Term (7+ years):
Leading developers in Dholera are positioning WTP access as a core USP:
Aspect | Dholera WTP (50 MLD) | Typical Urban WTP | Key Advantage |
Capacity | 50 MLD + expandable | 10–30 MLD | Future-ready scalability |
Technology | Multi-layer + SCADA | Basic filters + chlorination | Higher safety & control |
Energy Efficiency | Pumps + Solar-ready | Standard energy use | Lower O&M & carbon footprint |
Compliance | RERA, EIA, CPCB | Often varies | Higher regulatory confidence |
Water Loss Control | Leakage detection | Basic leakage control | Up to 20% saved annually |
Investor Appeal | High – green infrastructure | Standard essential utility | Premium positive perception |
The 50 MLD WTP worth ₹94.85 Cr is under construction by SPML Infra Limited, commissioned via Dholera SEZ authorities.
Yes. The WTP is designed for 24×7 potable supply, maintained via SCADA and smart metering.
Absolutely. Treated water meets IS 10500/BIS drinking water standards, with periodic lab tests and residual chlorine compliance.
Yes. WTP-integrated plots and properties are highly valued by NRIs due to assured infrastructure, higher resale value, and regulatory transparency ( Green norms).
A Phase‑II is under consideration to enhance capacity to 100 MLD+, in alignment with the city’s 2035 development roadmap.