Dholera : Fast-Tracking High-Tech Manufacturing & Industrial Powerhouses

The Rise of a Smart Industrial Behemoth
Fast-Tracking High-Tech Manufacturing & Industrial Powerhouses: Dholera Special Investment Region (DSIR) is not merely another industrial zone—it’s India’s largest Greenfield smart city and is on track to revolutionize global manufacturing. Spanning 920 km², its foundation under the Gujarat Special Investment Region Act (2009) aimed to blend scale, sustainability, and cutting-edge infrastructure. Kerala native Prime Minister Narendra Modi, then CM of Gujarat, first unveiled this development as a “global hub for innovation and high-tech manufacturing.”
Implementation & Foundational Infrastructure
SPV Formation & Activation Area
In 2016, DICDL—a joint venture between the Government of India and Gujarat—became the implementation vehicle for DSIR. By 2019, the Activation Area (22.5 km²) was operational, featuring the ABCD building, the city’s smart command-and-control hub, and readying itself for commercial infrastructure including the country’s first semiconductor fab.
Plug-and-Play Ecosystem
- 72 km internal roads, ranging from 18–70 m in width, topped by a robust underground utility corridor delivering uninterrupted electricity, data, water, gas, and effluent solutions.
- Established utility infrastructure: power substations, 50 MLD WTP, 10 MLD sewage plant, and a CETP—all overseen via SCADA-enabled City Integrated Operations Centre (CIOC).
This integrated setup slashes construction lead times, simplifies commissioning, and reduces capital expenditures—creating a high-margin environment for investors.
Connectivity: Seamless From Local to Global
- Dholera International Airport: Scheduled for cargo operations in Q2 FY25–26 and passenger flights by early 2026—positioning the region as a strategic logistics hub.
- Ahmedabad–Dholera Expressway: A 110 km, four-lane controlled-access highway, reducing travel time from 2h15m to just 1 hour—95% completed by May 2025.
- Bhimnath–Dholera Freight Rail (24.4 km): Operational by 2025, this link connects DSIR to Western Railway for efficient cargo movement.
- Semi-high-speed passenger rail planned alongside the expressway to further support commuter and business connectivity.
High-Tech Projects: Semiconductors & Electronics
🇮🇳 India’s First Commercial Semiconductor FAB
- By Tata Electronics & Taiwan PSMC, this 91,000 crore ($11B) fab will produce 50,000 wafers/month using 28 nm and 14 nm nodes, expected to be fully operational by 2026.
- This project alone promises 20,000+ skilled and indirect jobs, boosting the local cluster with ancillary projects and supply chain investments.
Future-Ready Display and Compound Semiconductor Facilities
- Collaborations with Himax Technologies and PSMC are set to bring display semiconductor capacity and compound-optics manufacturing, supported by IESA Vision Summit 2025 announcements.
Emerging Projects & Ecosystem Growth
- Announced facilities include Micron’s ATMP plant, Vedanta-Foxconn fab, and Jabil’s silicon photonics plant, together targeting ₹40,000+ crores in high-tech investments.
Sustainability: Smart & Green by Design
- Rated IGBC Platinum, Dholera features green mobility corridors, pedestrian-friendly layouts, and extensive roadside plantations scheduled for Monsoon 2025.
- Renewable Energy Initiatives: A 300 MW solar park already powering the Activation Zone.
- Wastewater Reuse: 100% treated and recycled via STP/CETP, with plans for desalination to meet semiconductor fab purity standards.
Liveability & Social Infrastructure
By 2026, DSIR is set to host a 200-bed multi-specialty hospital, corporate hotel (100+ rooms), higher-secondary school, fire station, and investor tent city with commercial amenities—all seamlessly tied into the industrial ecosystem.
Investment & Developer Opportunities
- Mega Land Parcels: Industrial plots ranging from 1 to 330 acres, ideal for large fabs or manufacturing plants within the Activation Area.
- Industrial Supports: Opportunities abound in clean-room design, skill-training centres, testing labs, and OSAT facilities.
- Real Estate & Social Services: Demand for residential, commercial, hospitality, retail, and recreation infrastructure is emerging rapidly as development scales.
Competitive Edge: Why Dholera Stands Out
Unique Feature | Advantage |
Scale | 920 km² region, including 110 km² Activation Area |
Plug-and-Play Infrastructure | Roads, SCADA monitoring, WTP/STP, UX-ready utility setup |
Multi-layer Connectivity | Air + expressway + freight/passenger rail ready |
Global Tech Projects | Semicon, display fab, data centres, EV components |
Sustainability | IGBC Platinum, solar energy, water recycling, green corridors |
Social Infrastructure | Hospital, hotel, school, fire station, tent city |
Dholera Smart Ciry Industrial FAQ
- India’s first semicon fab (Tata‑PSMC), display fabs (Himax), compound-semiconductor setups, plus OSAT and EV components facilities.
- Commercial wafer output anticipated by late 2026, with initial shipments earlier that year.
Yes– Activation Zone features plug-and-play SCADA-managed utilities, WTP/STP, CETP, road/rail connectivity are 95% ready.
- IGBC Platinum-rated, solar park operational, full water recycling, green mobility planning—all central to its urban design.
- Plots from 1–330 acres, policy support from GSEM, capital subsidies up to 75%, fast-track approvals, and tax exemptions.
Final Insight
Dholera SIR is no longer aspirational—it is operational. With massive real estate, industrial, social & green infrastructure advanced and incoming high-tech megaprojects underway, it’s turning into India’s Silicon Valley 2.0.
If you’re looking to invest in advanced electronics, leverage large-scale land, integrate ESG-aligned infrastructure, or develop next-gen amenities, Dholera offers unmatched potential.



